On 15th December, the sixth floor of the hospital was reopened after the renovation. This floor was renovated by the sponsorship of Enel Cuore who donated the foundation with Euros 500,000 for the renovation of the 6th and 7th floor.
On 15th December, the sixth floor of the hospital was reopened after the renovation. This floor was renovated by the sponsorship of Enel Cuore who donated the foundation with Euros 500,000 for the renovation of the 6th and 7th floor.